Shingle Installation

Out of all the phases of the roofing process, shingle installation is the one that can make or break the end result. Listed below are the steps we undertake to ensure the shingle system meets and exceeds manufacturer standards of installation. 

- NAILING:

Even distribution along nailing strip of shingles with a minimum of 4 nails properly driven. All nails are galvanized and corrosion-resistant.

- POSITIONING:

Caution must be exercised to ensure that end joints are no closer than 2" from fastener in the shingle below and that side laps are no less than 4" in succeeding courses.

- SEAL AROUND FLASHINGS:

Shingles are precision cut around vents, flashings, valleys and side edges of roof. Extra cement is applied along the flashings within 3" of the edge of the shingles.